Feb.2008
The experts were organized for reviewing the ¡°The Primary Feasibility Study Report on Generation and Transmission Project in Tierra del fuego, Argentina¡±, which is compiled by our company.

May.2008

¡°Construction Documents Design for Coal Transport System of Inner Mongolia Tong liaojin¡± which is the 1st sales contract, and signed after the company establishment. This contract shows that the company has stepped up to a self-administered operation mode.

Jul.2008

1. Wined the bid of Jingbian-YanChang 2¡Á50MW+4¡Á300h/t Thermoelectric Project.
2. Signed the project contract of access system for Hengdong Yulin Power Plant.
3. Reviewed the Tierra del fuego Project V3, Argentina, modified and improved V4 and V4.1 in terms of the suggestions from reviewers, and submitted to owner to define a project for approval.

Aug.2008

We have taken over the project ¡°Automation Plan for the Five-year Communication and Schedule¡± of Yulin office.

Sep.2008

We have carried with a research project on service ability of self-power station for the Tierra del fuego Methanol Plant in Argentina.

Oct.2008

We have taken over the design plan for the five counties¡¯ allocation of Yulin office.

Nov.2008

1. Taken over the design plan on Turbine Island of self-power station for Shanhua Chemical Fertilizer Stock Co., Ltd.
2. A three-man group has been sent to Argentina for investigation.

Dec.2008

1. Accepted the invitation of EPC bid for Puchuncavi 2¡Á330 MW Coal Fired Power Plant in Chile.
2. Accepted the invitation of EPC quotation for Chaco 2¡Á25 MW Wood Power Plant.

Jan.2009

Finished the contract of ¡°Feasibility Study for 1¡Á5MW Solar Power Station¡±.

 
xi'an continental electric power design & engineering co.,ltd

Add:Tianxin Tower 27/F.13 Fengcheng 2 Road Xi¡äan
Tel : +86 29 82501701   Fax : +86 29 82501711  Postal Code:710016
E-mail£ºoffice@cepdec.com